These rails near the back gate of SSU have been left unrepaired for quite some time. But there are no signs of them being fixed. When will they be in a sound position?
저작권자 © The Soongsil Times(숭실대영자신문) 무단전재 및 재배포 금지
These rails near the back gate of SSU have been left unrepaired for quite some time. But there are no signs of them being fixed. When will they be in a sound position?